Cairn Solar - FRESH Appliances Project IRR: 31% Size: 11 MWP (6 MW in 2022 extended to 11 MW in 2024) Commissioning Schedule: 3 MW in 2023 3 MW in 2024 5 MW in 2025 Current Annual Savings: EGP 32m
PICO AGRICULTURE Project IRR: 35% System Capacity: 1,292 KWP (792 KWP in 2022 expanded to 1,292 KWP in 2024) Commissioning Date: January 2022 Annual Energy Savings: EGP 4.1 million
HALAWANI BROS Project IRR: 31% Size: 1 MWP Commissioning Date: 2024 Current Savings per Year: EGP 3m
TIBA MANZALAWY Project IRR: 30% Size: 685KWP (365KWP in 2024, extended to 685KWP same year) Commissioning Date: July 2024 Current Savings per Year: EGP 2.1m
Nourish Agriculture (Pumping) Project IRR: 60% Size: 1000KWP (430KWP in 2024 extended to 1000KWP until present day) Yearly Diesel Savings: EGP 25m
Mamiba Cosmetics COMMISSIONING DATE: 09.30.2019 SAVINGS IN YEAR 1: EGP 1.1M PROJECT IRR: 35% SIZE: 495KWP
ROCKAL FACTORY Project IRR: 29% Size: 662 KWP (400 KWP + 262 KWP) Commissioning Date: July 14th, 2019 Current Savings Per Year: EGP 1.8m
MEDGRAINS Project IRR: 34% Size: 800 KWP (500KWP + 300KWP) Commissioning Date: August 2021 Current Savings per year: EGP 2.4m
Cairo American College Project IRR: 28% Size: 377 KWP Commissioning: November 2023 Current Savings per Year: EGP 1.2m
Tropitel Dahab Project IRR: 28% Size: 295 KWP Commissioning: February 2023 Expected Savings in Year 1: EGP 0.6m
Kempinski Soma Bay Project IRR: 32% Size: 150 KWP Commissioning: February 2023 Expected Savings in Year 1: EGP 0.35m
TREDCO EL SAYAD Project IRR: 36% Size: 260 KWP Date: December 31st, 2020 Current Savings per year: EGP 0.78m
Morcos Engineering, United Brothers, Modern, Farm Stars, Redcon, Gascool, Sianco, Gawhara Aluminum, Redcross, Al Baheya Agriculture